1
Transfer Switch
A licensed electrician will install your Automatic Transfer Switch
2
Set The Generator
After the ATS is installed, the team will move your generator into place
3
Connect the Generator
The electric lines will be connected from your ATS to your generator
4
Connect Fuel
Once the electric is connected, a pipefitter will connect the fuel source to your generator
5
Activate and Test
Once connected, your generator specialist will activate the generator and test the system. Your remote service monitoring system will be connected and you will be trained on your Kohler Energy Management App.
Making it Simple
From Design to Post Installation Service, We Have You Covered
1
Design
Free quotation, planning and design Services tailored to your home.
2
Installation
Professional installation by Licensed Electricians and Pipe Fitters
3
Test
Thorough testing and verification by certified Kohler generator Specialists
4
Service and Monitoring
Warranty Preservation and Remote Monitoring assures worry free operation when you need it most.